Laserfiche WebLink
Mobilization Worksheet Cont’d Task # 140 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: CAÑON CITY <br />Total one-way travel distance: 25.00 miles <br />Average Travel Speed: 45.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $1,030.36 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $87.74 <br /> <br />Transportation Cycle Time: <br /> Non- <br />Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.56 0.56 <br />Return Time (Hours): 0.56 0.56 <br />Loading Time (Hours): 0.33 NA <br />Unloading Time (Hours): 0.33 NA <br />Subtotals: 1.77 1.11 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 3.54 Hours <br /> <br />Total job cost: <br /> <br />$1,118 <br />