Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2015 Annual Hydrology Report S-12 <br />B Gulch - Spring 12 <br />Elevation - 7650 <br />Initiated <br />Activated <br />Date <br />7/12/1995 <br />7/12/1995 <br />7/12/1995 <br />7/12/1995 <br />7/1/2004 7/1/2004 7/1/2004 <br />7/1/2004 <br />10/6/2015 8/5/2015 6/16/2015 <br />4/18/2015 <br />Summary Information <br />Field <br />Parameters <br />TheConductivity <br />Baseline Operation <br />• <br />� • 11 • 11 • 11 1 •• 1 •1 1 •1 ���� <br />FieldComment <br />Conductivity <br />Temperature <br />Lab <br />Parameters <br />MEN <br />Bicarbonate <br />Oil and Grease <br />BROWN M., M1 <br />Manganese (Total) <br />Molyebdenum <br />monitoring point for S-12 is located along a switchback road that ascends the southern facing exposure of the canyon wall of the North <br />Fork of the Gunnison River. The road leads to the broad ridge which separates the Hubbard Creek and Terror Creek drainage systems. <br />Baseline Information for Point S-12 is derived from events beginning on 7/12/95 through 7/1/04. <br />Point Influenced by mining on 7/1/04. <br />Figure 27 <br />