Laserfiche WebLink
7 (FORM 2-Public filing) <br /> 12. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br /> PLS/acre. For assistance with formulating seed mixtures and rates,contact the local NRCS if on private land,BLM/USFS if <br /> on public land or State Land Board if on state land. <br /> A. Provide plant name and seeding rate <br /> Plant Name Seeding Rate(PLS/acre) <br /> Wildrye 2.00 <br /> Wheatgrass 2.00 <br /> Smooth Brome 2.00 <br /> Slender Wheat 1.00 <br /> Crested Wheat 1.00 <br /> Orchard Grass 1.00 <br /> Perennial Ryegrass 1.00 <br /> B. Describe the method for seed bed preparation,and application method for grass/forb seeding: <br /> The seed will bg either drilled or hand broadcasted as appropriate. If broadcast. it will <br /> be covered by hand raking or by harrow methods. Experience shows that covering of <br /> e seecl results Ina higher number ot sprouts per pound ot seed sowed. The see <br /> rnix wil' be sowed at a rate of no less t! di, 10 pom ids per sue, vi pei suppliet's <br /> recommendations In areas_wjth_stAzp hillgiripQ' rerjAmqtjnn mats- or netting might <br /> also be used to assist vegetation if deemed necessary by the engineer. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 3. Reclamation measures shall be fulfilled in a timely manner and completed within five(5)years of completion of prospecting <br /> activities. <br /> 4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5,precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails,where practicable. Existing roads which are to remain as <br /> permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br /> prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> stream channel. Drill cuttings must be spread to a depth no greater than one-half(1/2) inch or buried in an approved <br /> disposal pit; <br />