Laserfiche WebLink
4 (FORM 2-Public filing) <br /> 11. Describe proposed surface excavation or Other land disturbance,including roads,pits,trenches,waste piles,drill pads and <br /> collar areas of underground workings,ponds,etc... <br /> THE INTENT OF THIS NOI IS TO REPLACE PREVIOUS NOIs PER DRMS ORDERS AND TO ALLOW THE PROSPECTOR <br /> I NE SAME FLEXIBItITY 10 t:Xrt%jKr-AS WAS AVAIttstr-!I!THOSE PREVIOUS N01-5. it is hopled that OCC31101nic g0ld <br /> mineralization exists on property. Exploration is Intended to rind mineralization. Following positive geological and geophysical <br /> studies,surface disturbance will proceed. Any Initial drilling and testing Is anticipated to be confined to previously disturbed <br /> areas -It minerali—lion is lot we' then the prog cam Cn,dri eXpn orl heyond At this limp,thim PLXjPnf nnri location nf A ny <br /> mineralization Is not known,so future exploration cannot be predicted. <br /> 12. Proposed Disturbance(approximate)Describe the proposed drilling to be conducted,including anticipated number of holes, <br /> diameter,depth,location,etc... Submit additional pages if necessary: <br /> A. Drill Pads: Quantity 1•00_Average Width 20.00 (R)Average Length 20.00 _(ft) <br /> B. Drill Holes:Quantity 2.00 Depth 300.00 (ft) Diameter 2.50 (in) <br /> C. Mud Pits: Quantity 0.00 Average Width (ft)Average Length_ (ft) <br /> Average Depth, —(ft) <br /> Described proposed underground work,including reopening of old workings,advancement of edits or shafts, <br /> trenches,pits,cuts,rock dumps,or other types of disturbance,describe type,quantity and general dimensions: <br /> Unknown at this time but can include rock mapping and sampling, trenching, sampling <br /> of dumps <br /> F. Other Disturbances(please describe): <br /> If drill pads are to be constructed in areas beyond areas of historic disturbance. temporary <br /> roads might be constructed. <br /> G. Indicate Chemicals and Fuels used or stored on site. List type,quantity and method to store. <br /> FuaLstnrpd_in fuel tanks in vehicles and equipment (estimated at less than 500 gal) <br /> Drill Fluids include Portland cement, bentonite, polymer stored in manufactures containers <br /> Lubricants including oil and grease (estimated total weight of less than 1,000 pounds total) <br /> F. New Road(s): Length 100.00 (ft)Width 10.00 (ft) <br /> Significantly Upgraded Road(s) Length n nn (ft)Width p_❑c (ft) <br /> Are culverts or other crossings proposed? If so,please describe: <br /> None <br />