My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-24_PERMIT FILE - M1977493
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977493
>
2016-05-24_PERMIT FILE - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 11:27:25 PM
Creation date
5/25/2016 11:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2016
Doc Name
Closure Documentation
From
Daryl Longwell
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION NUMBER: <br /> c&naXA401yw6,,,W,, CONCRETE CONSTRUCTION 03 30 00 SPE <br /> A Freeport-McMoRan Company TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> and used in the work, such as, but not limited to; concrete forms, form ties, <br /> expansion joint material, sealants, curing compounds, concrete additives, <br /> embedded items, concrete protective coatings, and any manufactured items <br /> used in the work. <br /> 2. The Contractor shall provide confirmation specifications or mill reports for <br /> steel reinforcement and fabricated embedded items. <br /> C. Concrete Mix Design <br /> 1. Prior to placing concrete, the Contractor shall submit to the Engineer and <br /> t Owner a written request for acceptance of the concrete materials and the <br /> r. . <br /> concrete mix designs proposed for use. This submittal shall include the <br /> results of all testing performed to qualify the materials and to establish the <br /> y mix design is in accordance with American Concrete Institute (ACI) 301, <br /> Section 4. The data submitted shall also include certification that all <br /> E9 material proposed for use in the concrete meets the specified requirements <br /> t and all test results, Manufacturer's certification and/or analyses which are <br /> the basis of this certification. No concrete shall be placed until the <br /> Contractor has received such acceptance in writing from the Engineer or <br /> is Owner. <br /> 2. The Contractor shall submit to the owner printed recommendations from <br /> the Manufacturer of concrete admixtures. The recommendations shall state <br /> the quantity and mixing requirements of the additives per cubic yard for <br /> each class of concrete specified herein. <br /> f <br /> D. Fabricated Item Shop Details <br /> F 1. Reinforcing Steel: Prior to fabrication or shipment of reinforcing steel and <br /> .. accessories, the Contractor shall submit to the Owner and Engineer, and <br /> receive approval of shop drawings by Engineer or Owner. Shop drawings <br /> shall indicate bending diagrams, assembly diagrams, splicing and lapping <br /> C--- of rods, shapes, dimensions and details of bar reinforcements and <br /> accessories. Shop drawings shall show all openings and penetrations that <br /> pass through concrete construction. Drawings and details shall conform to <br /> ACI 315 and ACI 318. The approval of shop drawings shall be for <br /> conformance to the design intent and shall not relieve the Contractor of <br /> responsibility for errors,omissions or the accuracy of his own dimensions. <br /> 1.03 QUALITY CONTROL & QUALITY ASSURANCE <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.