Laserfiche WebLink
- 0 - <br /> The Board ma,, suspend or revoke this perniit, or assess a ci\it penalty. upon a Iinding that tite permittee <br /> iolated the term, or conditions of this permit, the Act. the Mineral Rule,and RgL1lali0n1;. or that information <br /> contained in the application or,our permit nii,repre,ent important material fact,: <br /> i. !f \our mining, and reclamation operation, affect area, hewnd the boundaries of all approved pennit <br /> houndar,. ,uhstantial civil penalties. to \ou as perniittce can result,. <br /> .p Anv modification to the appro,ed minim and reclamation plan from those described in }our approved <br /> application require~}ou to submit a permit Modification and ohtain apprMal from the Board or Office. <br /> �. It is your responsibilit\ to notify the Office ofam changes in \our address or phone number: <br /> X / <br /> 6. Upon permit issuance and prior to leginnin11 on-site mining actin it,._�ou must post it sign at the entrance of <br /> the mine site. %,hick shall be clearh \isible from the access road, i\ith the tullo\�in" information(Rule 3.1.12): <br /> a. the name of the operator: <br /> b. a statement that a reclamation pennit for the operation has been issued b. the Colorado Mined Land <br /> Reclamation Board: and. <br /> C. the permit number. <br /> 7. The boundaries of'the pennit houndarn area must he marked h\ monuments or other markers that arc clearly <br /> isible and adequate to delineate such boundaries prior to site disturbance. <br /> /J K. It is a pro\i.ion of this pernut that the operations %%ill he conducted in accordance \%ith the terms and <br /> conditions listed in\ourapplication,as cell as\%ith the pro\ision:ofthe:act and the Construction Material Rule, <br /> and Regulation, in effect at the time the pennit is issued. <br /> 9. Annually.on the anni\er,ar\ date of pennit issuance.\au must suhmit an annual fec as speci tied by Statute. <br /> and an annual report \�hich include., a map describing the acreage affected and the acreage reclaimed to date(if <br /> there are changes from the prc�ious year). am monitoring required h\ the Reclamation Plan ur be subrilitted <br /> annuall\ on the anniversary date ofthe pennit appro\al. Annual ties are for the pre\iou,\,ear a pennit is field. For <br /> example.a permit\\ith the annis ersan date of.lul, 1. 1995.the annual Ice is for the peri0d of lulu 1. 1994 through <br /> June ;O. 1995. failure to submit\utn'annual tce and report b\ the perniit annker,ar\ date ma\ result ui a cis it <br /> picnalty, revocation of' our permit. and forfeit Ur"e of our tinancial uarraim. It ie vour responsibrlit\, as the <br /> pennittee,to continue to pa\ our annual tee w the Office until the Board releases uu from our total reclamation <br /> respon;ihilit\. <br /> _� I�. ForDint senture%partnenhi�uperaton:the signing representative is authorind to si�,n this ducunient and a <br /> poser of'attornes (pro\ided h\ the partner(sfl authori�inz the siLriature of the represLntati�e is attached to this <br /> application. <br />