My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2016-05-23_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 11:10:03 PM
Creation date
5/24/2016 9:21:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/23/2016
Doc Name
SI-02 Notice and Calculations
From
DRMS
To
Andy Weber
Inspection Date
5/4/2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Dozing method: 1.100 (50%SL <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.426 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.095 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.7698 <br /> Adjusted unit 1,624.66 LCY/hr <br /> production: <br /> Adjusted fleet 1624.66 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.159/LCY <br /> Total job time: 7.15 Hours <br /> Total job cost: $1,844 <br />
The URL can be used to link to this page
Your browser does not support the video tag.