My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2016-05-23_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 11:10:03 PM
Creation date
5/24/2016 9:21:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/23/2016
Doc Name
SI-02 Notice and Calculations
From
DRMS
To
Andy Weber
Inspection Date
5/4/2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Site: Weber Pit No 2 Permit Action: 2016 U date Permit/Job#: M1995056 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/19/2016 County: Archuleta Filename: M056-000 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Dispose of Misc. Scrap DEMOLISH 1 0.00 $3,100.76 <br /> 002 Reduce hi hwall to 31-1: 1V DOZER 1 7.15 $1,844.00 <br /> 003 Rip and Grade pit floors,32 acres DOZER 1 54.86 $14,156.00 <br /> 004 Replace topsoil,6"deep DOZER 1 51.58 $13,309.00 <br /> 005 Install rip rap in drainage ditches LOADER 1 0.74 $120.00 <br /> 006 Place rip rap in ditches EXCAVATE 1 1.27 $120.00 <br /> 007 1 Reve etate 35 acres of affected lands REVEGE 1 32.00 $47,956.00 <br /> 008 Mobilize to and from site MOBILIZE 1 4.40 $49440.00 <br /> SUBTOTALS: 152 $85,046 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,717.93 <br /> Performance bond: 1.05 Total= $892.98 <br /> Job superintendent: 60.00 Total= $4,468.80 <br /> Profit: 10.00 Total= $8,504.60 <br /> TOTAL O&P= $15,584.31 <br /> CONTRACT AMOUNT(direct+O&P)= $100,630.31 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contractibid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 6.20 $6,239.08 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $22,323.39 <br /> TOTAL BOND AMOUNT(direct+indirect)= $107,369.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.