Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: <br /> Site: Weber Pit No 2 Permit Action: 2016 U date Permit/Job#: M1995056 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/19/2016 County: Archuleta Filename: M056-000 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Dispose of Misc. Scrap DEMOLISH 1 0.00 $3,100.76 <br /> 002 Reduce hi hwall to 31-1: 1V DOZER 1 7.15 $1,844.00 <br /> 003 Rip and Grade pit floors,32 acres DOZER 1 54.86 $14,156.00 <br /> 004 Replace topsoil,6"deep DOZER 1 51.58 $13,309.00 <br /> 005 Install rip rap in drainage ditches LOADER 1 0.74 $120.00 <br /> 006 Place rip rap in ditches EXCAVATE 1 1.27 $120.00 <br /> 007 1 Reve etate 35 acres of affected lands REVEGE 1 32.00 $47,956.00 <br /> 008 Mobilize to and from site MOBILIZE 1 4.40 $49440.00 <br /> SUBTOTALS: 152 $85,046 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,717.93 <br /> Performance bond: 1.05 Total= $892.98 <br /> Job superintendent: 60.00 Total= $4,468.80 <br /> Profit: 10.00 Total= $8,504.60 <br /> TOTAL O&P= $15,584.31 <br /> CONTRACT AMOUNT(direct+O&P)= $100,630.31 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contractibid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 6.20 $6,239.08 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $22,323.39 <br /> TOTAL BOND AMOUNT(direct+indirect)= $107,369.39 <br />