My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2016-05-23_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 11:10:03 PM
Creation date
5/24/2016 9:21:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/23/2016
Doc Name
SI-02 Notice and Calculations
From
DRMS
To
Andy Weber
Inspection Date
5/4/2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize to and from site <br /> Site: Weber Pit No 2 Permit Action: 2016 Update Permit/Job#: M1995056 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 5/19/2016 County: Archuleta Filename: M056-008 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership_Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat 69T-9SU 66.13 $83.77 $125.45 1 $209.22 $125.45 $250.00 <br /> Cat 315D L 8'-6" 19.05 $24.65 $88.67 1 $113.32 $88.67 $250.00 <br /> Stick <br /> CAT 950H 2O.13 $22.19 $88.67 1 $110.86 $88.67 $250.00 <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: $561.66 1 $391.46 1 $1,000.00 <br /> ROADABLE EOUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4 3/4 T. $13.42 1 $13.42 $13.42 <br /> Subtotals: 1 $13.42 1 $13.42 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.