My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23_INSPECTION - M2006059
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2006059
>
2016-05-23_INSPECTION - M2006059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:22:26 PM
Creation date
5/24/2016 9:17:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006059
IBM Index Class Name
INSPECTION
Doc Date
5/23/2016
Doc Name
Returned mail - Inspection Report
From
USPS
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: CDR Pit Permit Action: 2016 Update Permit/Job#: M2006059 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/11/2016 County: Archuleta Filename: M059-000 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Rough Grade to 3H: 1V LOADER 1 16.91 $1,372.00 <br /> 002 Replace Topsoil 6"deep over 3 acres of disturved LOADER 1 17.93 $1,455.00 <br /> land <br /> 003 Revegetation of 3 acres affected lands REVEGE 1 0.00 $4,131.00 <br /> 004 Mobilize to and from job site MOBILIZE 1 4.40 $1,963.00 <br /> SUBTOTALS: 39.24 $8,921 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $180.20 <br /> Performance bond: 1.05 Total= $93.67 <br /> Job superintendent: 19.62 Total= $1,461.30 <br /> Profit: 10.00 Total= $892.10 <br /> TOTAL 0&P= $2,627.27 <br /> CONTRACT AMOUNT(direct+O&P)= $11,548.27 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 0.00 $0.00 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $3,127.27 <br /> TOTAL BOND AMOUNT(direct+indirect)= $12,048.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.