Laserfiche WebLink
Loader Worksheet Cont'd Task#001 Page 2 of 2 <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res.(%) (%) (minutes) <br /> Haul Route: 50 5.00 10.00 15.00 0.0781 (Cat HB) <br /> Return Route: 50 -5.00 10.00 5.00 0.0353 (Cat HB) <br /> Total Travel Time: 0.1134 minutes <br /> Total Cycle Time: 0.5084 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 1.50 LCY(heaped) <br /> Bucket Fill Factor: 1.025 Rock-Earth Mixture(100%-105%) 1.025 <br /> Adjusted Capacity: 1.54 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 7600 feet <br /> Source <br /> Altitude Adj: 0.95 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.79 multiplier <br /> Unadjusted Hourly Unit Production: 181.45 LCY/Hour <br /> Adjusted Hourly Unit Production: 143.07 LCY/Hour <br /> Adjusted Hourly Fleet Production: 143.07 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 16.91 Hours <br /> Unit cost: $0.567 /LCY Total job cost: $1,372 <br /> CIRCES Cost Estimating Software <br />