Laserfiche WebLink
began to rise again in Q4. A survey of the fire water loop revealed another suspected <br /> leak. Upon excavation another failed tee was found and repaired. The level has been <br /> stable since completing the second repair. <br /> 2. CC&V believes that the staining observed is likely caused by water from the above <br /> referenced fire protection loop reacting with the host fill material. <br /> 3. The stained seep areas are very small. Approximately 3' wide by 10-15' long. The area <br /> affected is therefore fairly minimal. <br /> 4. CC&V committed, during the inspection,to continue monitoring of these areas. <br /> 5. The current construction schedule indicates that the liner will be tied into the HG Mill <br /> platform liner in September of 2016. <br /> I believe the responses above address the concerns conveyed to us during your inspection. <br /> Should you require further information please do not hesitate to contact me at (719) 689- 4055 or <br /> Margaret.Burt@newmont.com <br /> newmont.com <br /> Sincerely, <br /> Meg Burt <br /> Environmental Manager <br />