Laserfiche WebLink
Weld County will be taking precautions in order to insure that all mining activities <br /> remain within the permitted area. The permit boundary will be staked in order to allow <br /> the free movement of the land owner's cattle when mining is not occurring, and mining <br /> will come no closer than 25 feet from the permit boundary. A setback of approximately <br /> 25 feet from any pipeline easements will be maintained. A berm will be constructed <br /> along the eastern edge of the Oneok Bakken Pipeline easement along the proposed <br /> haul road route leading from County Road 136.5 to the area to be mined. Mining wilt be <br /> completed so that vertical/high wall conditions will not occur, and the reclamation slopes <br /> will be mild; no steeper than one foot vertical change for every three feet horizontal <br /> change. In addition, no blasting will occur at this site. <br /> Weld County would like to request your authorization to conduct mining and <br /> reclamation activities within 200 feet of the structure specified in this document. Weld <br /> County agrees to provide fair compensation to Oneok Bakken Pipeline, L.L.C., if, in the <br /> course of conducting mining and reclamation activities, the structure is damaged as a <br /> direct result of these activities. <br /> Your signature below grants permission for Weld County to conduct mining and <br /> reclamation activities within 200 feet of the following structure: <br /> • buried pipeline <br /> If you have any questions, please feel free to call Bruce T. Barker, Weld County <br /> Attorney, at (970) 356-4000, extension 4390, or Valerie Mino, Weld County Water <br /> Engineer, at (970) 356-4000, extension, 3773. <br /> Sincerely, <br /> Valerie A. Mino —Water Engineer <br /> Weld County Public Works <br /> {00075940-1 }Page 2 of 4 <br /> Structure compensation agreement. <br />