My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-20_REPORT - M1984008
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984008
>
2016-05-20_REPORT - M1984008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 10:24:21 PM
Creation date
5/23/2016 9:15:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984008
IBM Index Class Name
Report
Doc Date
5/20/2016
Doc Name
Annual Fee, Report & Map
From
Barnhart Pit
To
DRMS
Annual Report Year
2016
Email Name
TOD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) <br /> RPM,Inc. <br /> May 12, 2016 RECEIVE" <br /> Attn: Mr. Tyler O'Donnell MAY 2 0 2016 <br /> Division of Reclamation, Mining and Safety DIVISION OF RECLAMATION <br /> 1313 Sherman St., Rm. 215 MINING AND SAKE T Y <br /> Denver, CO 80203 <br /> Re: Barnhart Gravel Pit Annual Report, M1984-008 <br /> Dear Mr. O'Donnell: <br /> On May 9, 2016, Mr. Andre Laroche, Transit Mix Concrete Co. delivered the annual fee to the <br /> Division of Reclamation, Mining and Safety, (Division), minus the annual report form and map. <br /> We received a 30 day extension from the Division for the annual report form and map on May 5, <br /> 2016 via an e-mail from Minerals Program Supervisor, Mr. Tony Waldron. <br /> Attached are the annual report and annual report map. Also included are invoices for mowing and <br /> weed spraying. In addition, significant work was done to remove Russian olive and salt cedar <br /> around the two ponds on an area just north and west of ponds #1 and #2. Please see the enclosed <br /> photograph and the annual report map. These actions are in conformance with the approved weed <br /> control plan dated October 15, 2014, included in part below: <br /> Following is the schedule for the weed control program. Refer to the attached map for weed locations. <br /> YEAR SPRING(April—May) FALL(late August-September) <br /> 2015 Spray all the Russian knapweed,the Respray all the Russian knapweed,the <br /> musk thistle,and the Canada thistle. musk thistle,and the Canada thistle. <br /> Removal of half of Russian Removal of the remaining Russian <br /> olive/saltcedar near Townsend Dr. olive/saltcedar near Townsend Dr. <br /> 2016 Removal of half the Russian Removal of remaining half the Russian <br /> olive/saltcedar surrounding the small olive/saltcedar surrounding the small <br /> pond and large pond. pond and large pond. Weed survey <br /> and mapping in the southeast portion <br /> of the site along Arkansas River. <br /> 2017 Spray and cut weeds identified along Spray and cut weeds identified along <br /> the Arkansas River. the Arkansas River_ <br /> In addition, a small area just north of pond #1 was regraded to reduce the slope and prepare the area <br /> for fall broadcast seeding using the approved seed mix. <br /> 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.