My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-18_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2016-05-18_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 11:06:50 AM
Creation date
5/19/2016 6:37:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
5/18/2016
Doc Name Note
4th Qtr 2015 & 1st Qtr 2016 Horse Gulch Fill
Doc Name
4th Quarter 2015 & 1st Quarter 2016 Gulch Fill Report Review
From
Zach Trujillo
To
Tabetha Lynch
Annual Report Year
2016
Report Quarter_Month
1
Email Name
ZTT
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />I Dtoai:men, of Ndturai RcxOuree; <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />May 18, 2016 <br />Interoffice Memo <br />Trapper Mine (Permit No. C-1981-010) <br />Interoffice Memo - Horse Gulch Fill Quarterly Fill Certification — 41 Qrt 2015 —1St Qrt 2016 <br />Tabetha, <br />After my review of the Trapper Mine's Horse Gulch Fill Quarterly Fill Certification — 4th Qrt 2015 <br />— 1St Qrt 2016, I have found the above referenced reports to be in general complianceof Rule <br />4.09.1(11): <br />4.09.1(11)(a) Inspected at least quarterly by a registered engineer or other qualified professional <br />specialist in construction of earth and rockfill embankments under the direction of <br />a qualified engineer throughout the construction. <br />The certified reports cover the 4th quarter monitoring period from October to <br />December of 2015 as well as the 1St quarter monitoring period from January to <br />March 2016. <br />4.09.1(11)(b) Provide to the Division a certified report within 2 weeks after each inspection that <br />the fill has been constructed as specified in the design approved by the Division. <br />The report shall include a description of any appearances of instability, structural <br />weakness, and other hazardous conditions. <br />The inspections were conducted on December 10, 2015 (4th quarter 2015) and <br />March 31, 2016 (1St quarter 2016). The Division received the reports on <br />December 21, 2015 and April 8, 2016 respectively. No instability, structural <br />weakness, or other hazardous conditions were noted during these inspections of <br />the fill. The area where cracker were detected on the top south portion of the fill <br />during the first quarter of 2013 was inspected during both quarters. Other areas <br />were differential settling has been observed in the past was inspected and no <br />additional settling was observed. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />of .Co10 <br />` 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.