Laserfiche WebLink
Table 1 <br /> April 2016 Depth to Groundwater Measurements and Groundwater Elevations <br /> Holcim(US) Inc. <br /> Florence, Colorado <br /> Depth to Well <br /> Well Depth to GW Bottom April GW Elevation <br /> Well Diameter TOC Elevation April 2016(ft 2016 April 2016 Total Depth Screened Interval <br /> Number (inches) (ft ams!) btoc) (ft btoc) (ft amsl) (ft bgs) (ft bgs) <br /> MW-7 4 5056.26 26.61 50.30 5029.65 47 17-42 <br /> MW-9 4 5121.90 8.02 45.55 5113.88 42 17-37 <br /> MW-11 2 5095.87 55.90 105.65 5039.97 103 58-103 <br /> MW-12 2 5254.04 96.17 150.30 5157.87 148 103-148 <br /> MW-13 2 5040.00 17.97 31.95 5022.03 30 15-30 <br /> P-2 1.5 5079.46 4.33 29.05 5075.13 36 31-36 <br /> P-3 1.5 5063.28 28.85 39.45 5034.43 37 32-37 <br /> DP-1 2 5069.70 8.38 36.50 5061.32 34 24-34 <br /> NP-1 2 5147.40 42.74 73.50 5104.66 70 60-70 <br /> Notes: <br /> ft amsl-Feet above mean sea level. <br /> ft bgs-Feet below ground surface. <br /> ft btoc-Feet below top of casing. <br /> GW-Groundwater. <br /> MW-Monitoring well. <br /> NA-Not available. <br /> P-Piezometer. <br /> TOC-Top of casing. <br /> Groundwater levels measured on April 4,2016 <br /> P:\AProject\255.10 Holcim\GW Monitoring Report\March 2016\1-Tables\Tables 1,2_04292016 Page 1 of 1 <br />