Laserfiche WebLink
cv\'-7 RECEIVED <br /> JAN 1 4 n15 15 Page 2 of 3 <br /> DMVISIO“ ... . _,..AMATION, <br /> M == e �, y RALS 112c Annual Report <br /> , REPORT 20, <br /> Permittee Name: City ounty of Denver, Board of Permit Number: M-1978-052 <br /> Water Commissioners <br /> Operation Name: Howe Pit County: Adams <br /> Annual Fee Due: $791.00 Anniversary Date: February 15, 2015 <br /> Permit Acreage: 629.30 Current Bond Amt: $0.00 <br /> According to C.K.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br /> monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will he reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). TO NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? ES NO <br /> If"YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation, processing or hauling activity at the mine? Zo < <br /> 5. Does the mine operate more than 180 days per year YES <br /> If"NO", please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br /> b) approval for INTERMITTENT OPERATION? YES • <br /> 7. Number of acres currently affected(mining+ incomplete and or unreleased reclamation). (a 2R', <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: 1" replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: r� fertilized w/ replacement rate(tons): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application 1-"I - application I A- application r..11 Ar- <br /> method: method: method: <br />