My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-12_ENFORCEMENT - M2004052
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004052
>
2016-05-12_ENFORCEMENT - M2004052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:55 PM
Creation date
5/16/2016 8:02:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004052
IBM Index Class Name
ENFORCEMENT
Doc Date
5/12/2016
Doc Name
Board Order
From
DRMS
To
Phillips County
Violation No.
MV2016029
Email Name
ERR
WHE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(20') beyond the permit boundary. The Division observed that this erosion was <br /> caused by stormwater entering the site and running down the highwall along the <br /> southern permit boundary, causing a gulley which headcut and migrated to the <br /> south. The other erosional feature the Division observed was located in the <br /> northwest corner of the site that was twenty feet (20') wide, one hundred feet (100') <br /> long, and extended at least twenty feet (20') beyond the permit boundary. The <br /> Division observed that this erosion was caused by channelized stormwater which <br /> flowed down Wildhorse Creek, entered the excavation, and caused a headcut. The <br /> Division summarized that Operator failed to stabilize and protect the affected <br /> lands, which then caused erosional features to affect non-permit lands. The <br /> Division believes these two erosional features are primarily due to the lack of <br /> activity at the site for nearly four (4) years. <br /> 4. On March 25, 2016, the Division mailed the March 9, 2016 inspection <br /> report and a Reason to Believe a Violation Exists and Notice of Board Hearing to the <br /> Operator. The Reason to Believe letter cited the potential violations as the failure <br /> to protect areas outside of the affected land from damage occurring during the <br /> mining operation and failure to stabilize and protect all surface areas of the affected <br /> land as to effectively control erosion, and providing information about the April 27- <br /> 28, 2016 hearing. <br /> CONCLUSIONS OF LAW <br /> 5. The Board has jurisdiction over this matter pursuant to the Colorado <br /> Land Reclamation Act for the Extraction of Construction Materials ("Act"), Article <br /> 32.5 of Title 34, C.R.S. <br /> 6. Under section 34-32.5-116(4)(i) C.R.S., operators are required to <br /> protect areas outside of the affected land from slides or damages occurring during <br /> the mining operation. Operator failed to protect areas outside of the affected land <br /> from slides or damages occurring during the mining operation in violation of section <br /> 34-32.5-116(4)(i), C.R.S. <br /> 7. Under section 34-32.5-116(4)6), C.R.S., operators are required to <br /> stabilize and protect all surface areas of the affected land as to effectively control <br /> erosion. Operator failed to stabilize and protect all surface areas of the affected <br /> land to effectively control erosion in violation of section 34-32.5-116(4)(i), C.R.S. <br /> 8. By violating section 34-32.5-116(4)(i) and (j), C.R.S., the Operator <br /> failed to comply with the provision of the permit that requires the mining operation <br /> to be conducted in accordance with the provisions of the Act. <br /> 9. Pursuant to section 34-32.5-124(2), C.R.S., the Board may issue a cease <br /> and desist order if it determines that a permit violation has occurred. The Board <br /> Phillips County <br /> Rafert Pit/M-2004-052 <br /> MV-2016-029 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.