My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-12_REVISION - M2006059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006059
>
2016-05-12_REVISION - M2006059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:32 AM
Creation date
5/13/2016 8:50:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006059
IBM Index Class Name
Revision
Doc Date
5/12/2016
Doc Name
SI-01 Notice and Calculations
From
DRMS
To
Ron Trujillo
Type & Sequence
SI1
Inspection Date
5/3/2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize to and from iob site <br /> Site: CDR Pit Permit Action: 2016 Update Permit/Job#: M2006059 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 5/11/2016 County: Archuleta Filename: M059-004 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownershi Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EOUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr!unit , Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> CAT 446D 9.80 $17.48 $88.67 1 $106.15 $88.67 $250.00 <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: 1 $234.41 $177.34 $500.00 <br /> ROADABLE EOUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.