Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#03A Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 4500.00 10.00 8.00 18.00 600 7.503 <br /> Haul Time: 7.503 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 4500.00 -10.00 8.00 -2.00 2938 1.579 <br /> Return Time: 1.579 minutes <br /> Total Truck Cycle Time: 11.195 minutes <br /> Loading Tool unit <br /> Production 442.86 LCY/Hour Adjusted for job efficiency: 367.58 LCY'Hour <br /> Truck Unit Production <br /> 46.89 LCY/Hour Adjusted for job efficiency: 38.92 LCY/Hour <br /> Optimal No. of Trucks: 9 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 77.85 LCY/Hour <br /> Adjusted single truck/loader team production: 77.85 LCY/Hour <br /> Adjusted multiple truck/loader team production: 77.85 LCY/Hour <br /> JOB THE AND COST <br /> Fleet size: 1 Team(s) Total job time: 131.86 Hours <br /> Unit cost: $8.720 /LCY Total job cost: $89,501 <br /> CIRCES Cost Estimating Software <br />