My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-04_REVISION - C1982056 (12)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-05-04_REVISION - C1982056 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:44 PM
Creation date
5/6/2016 1:57:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
5/4/2016
Doc Name
Proposed Decision & Findings
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
PR10
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stipulation was attached with TR -67 and is complied with as a result of this Permit <br />Renewal (RN -06): <br />Stipulation No. 64: was attached to the permit through TR -67, approved on November <br />13, 2009. Twentymile Coal is approved to construct the Refuse Disposal Area <br />Expansion in accordance with designs approved in Technical Revision No. 67. <br />Twentymile Coal Company requested to provide bond for the increased disturbance <br />area in three increments. The first increment, "Initial Bonded Disturbance" of 50.0 <br />acres, is limited to construction of 30.3 acres of refuse pile expansion, 2.4 acres of haul <br />road corridor, 5.9 acres of unclassified stockpile, 3.5 acres of topsoil stockpile, .04 <br />acres of stockpile haul corridors, and 7.5 acres of construction of RDA 10 and RDA I <br />ditches, as shown on Map C-102 (11/13/2009). Prior to disturbance of the Refuse <br />Disposal Disturbance, Twentymile Coal is required to submit additional bond adequate <br />for disturbances associated with bonding increments I and II. No disturbance <br />associated with bonding increments I and II shall occur prior to submittal and Division <br />approval of additional bond. <br />TC will begin the extension of the underdrain and construct additional temporary <br />perimeter collection ditches in conjunction with the initiation of Phase 11 of the RDA <br />Expansion. Phase II will involve an additional 30 acres of disturbance for the Phase II <br />footprint and soil removal buffer zone. All bonding costs associated with the Phase II <br />expansion had been incorporated in the RN -06 cost estimate. The information <br />associated with Stipulation No. 64 has been incorporated into the PAP. This <br />stipulation was considered complied with when RN -06 was issued. <br />IX. Coal Mine Waste — Rule 4.11 <br />The Coal Mine Waste Fire Fighting Plan is found in Exhibit 25a of the permit (4.11.1). <br />Twentymile Coal Company has previously been approved to dispose of select non - <br />coal waste in a location south of the Area 1 pit. This location is located in spoil <br />material from the Energy Mine No. 1, and is located above the water table (4.11.4(1)- <br />(3)). In addition, coarse coal processing waste is placed in the coal mine waste bank. <br />Coal processing waste fines are placed in the coal mine waste bank or returned <br />(thickener underflow) to abandoned workings in the Southwest Mining District or <br />Eastern Mining District. <br />No coal mine wastes are stored at the Fish Creek Tipple (4.11.3). <br />X. Backfilling and Grading <br />The Foidel Creek mine portals are located along Foidel Creek, faced -up in the <br />highwall from the adjacent surface mining activity in Eckman Park. Partial backfilling <br />and grading was done to help seal the portal area from groundwater inflow. The <br />remaining backfilling and grading will occur at the completion of mining activity at <br />the Foidel Creek mine. No specific approvals are granted under this section. <br />Page 33 of 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.