My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-05_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-05-05_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:46 PM
Creation date
5/6/2016 11:56:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/5/2016
Doc Name
4th Adequacy Review Memo
From
Leigh Thompson
To
Rob Zuber
Type & Sequence
PR4
Email Name
LDS
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rob Zuber <br />Page 5 <br />May 5, 2016 <br />E:111111 <br />WILL BE SUBMITTED NO MORE THAN 90 DAYS AFTER WELL COMPLETION. THESE <br />ACTIONS MUST BE COMPLETED BEFORE ANY DISTURBANCE ASSOCIATED WITH THE <br />COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br />a. Stipulation 19: DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR <br />REVISION BE SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 <br />OF VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE <br />ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br />b. Stipulation 20: A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING <br />WELLS MUST BE IN PLACE, AND A MINOR REVISION TO THE PERMIT SUBMITTED AND <br />APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF VOLUME 1 OF THE PERMIT <br />APPLICATION PACKAGE, BEFORE ANY DISTURBANCE ASSOCIATED WITH THE COLLOM <br />PIT BOX CUT IS ALLOWED TO OCCUR. <br />c. The response is sufficient. <br />d. The response is sufficient. <br />Rule 2.06.8 — Alluvial Valley Floors <br />82. The response is sufficient. <br />Rule 2.10 — Maps and Plans <br />83. The response is sufficient. <br />Rule 4.05.13 — Surface and Ground Water Monitorin <br />84. The response is sufficient. <br />85. The response is sufficient. <br />86. Stipulation 21: COLOWYO COAL COMPANY WILL CONSTRUCT GROUNDWATER POINT OF <br />COMPLIANCE MLC -04-02, AND CARRY OUT STANDARD WELL TESTS TO ESTIMATE AQUIFER <br />PROPERTIES. FOLLOWING COMPLETION OF THE WORK A MINOR REVISION WILL BE SUBMITTED <br />TO UPDATE THE PERMIT APPLICATION PACKAGE WITH A COMPLETE DESCRIPTION OF THE WELL, <br />AND TO UPDATE TABLES 2.04.7-38, -39, -40 AND -42. MAPS 10B AND 11C SHOULD ALSO BE <br />UPDATED. THESE ACTIONS SHOULD BE COMPLETED BEFORE THE END OF CALENDAR YEAR 2016. <br />Additional items <br />87. The response is sufficient. <br />
The URL can be used to link to this page
Your browser does not support the video tag.