Laserfiche WebLink
100-year flood plain. Once deposition of the Waste Rock is complete,the WRP's will be <br /> covered with soils and vegetated to the same standards of the existing WRP covers. <br /> As can be seen in the enclosed analysis by Engineering Analytics, Inc., the cost estimated for <br /> the work proposed under TR-23 is slightly less than the estimate for disposal in the CV Glory <br /> Hole. Therefore the existing surety established for Amendment 4 is sufficient for the <br /> remediation proposed in TR-23. <br /> Please contact me with any questions or comments. <br /> Sincerely, <br /> \ANL.) , <br /> Ken Mushinski <br /> President <br /> Cc: Tony Waldron, DRMS <br /> Steve Cohen Cotter <br /> 1. <br />