My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-04_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2016-05-04_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:44 PM
Creation date
5/5/2016 9:30:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
5/4/2016
Doc Name
Request TR11
From
High Mountain Mining Co., LLC
To
DRMS
Type & Sequence
TR11
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CF Cole <br /> w; " r$ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> * '� 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1985-029 site Name:Alma Placer Mine <br /> County Park TR# (DBMS Use only) <br /> Permittee: High Mountain Mining Co. LLC <br /> Operator(If Other than Permittee): V TR11 A\ ep <br /> +COMPLIED <br /> 43 VI <br /> Jim Murray <br /> VIOLATIONS MV-2014-039 <br /> Permittee Representative. MV-1991-0280 4 2016 <br /> MV-2006-052 �AY � <br /> Please provide a brief description of the proposed revision: nmsoNaF REC, <br /> Revises the mining phases in the southern portion of the mine site. 0Iy1NC Ate <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 v <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 E <br />
The URL can be used to link to this page
Your browser does not support the video tag.