Laserfiche WebLink
004 Ripper 4 -5 $42:00 <br /> 0(12 '' - . - - . - • - - Leader 4 4:03 $400:00 <br /> 003 Pull down unstable spoil material onto Excavate 1 14.88 $957.00 <br /> operating pad <br /> 004 Pull in berm at edge of operating pad,for Excavate 1 2.77 $178.00 <br /> backfill <br /> 004alt Install permanent steel/cable fence around Construction - $1600.00 <br /> east perimeter of pad (160 ft. x 10.00 lin. foot) <br /> 806 '- -. - • - '. - - - SezeF 1 3.35 X50:00 <br /> 005alt Permanently seal two westerly portals with -- -- $2,100.00 <br /> concrete block 300 square feet)x$7.00 sq/ft <br /> 806 • - . • . _. - . . • • - . . ' , - . Demolish 4 :80 $3,961.57 <br /> 006alt Remove or dispose of onsite debris, etc. Demolish 1 .00 $1,000.00 <br /> 007 Push loadout fill material to portals, across Dozer 1 .70 $116.00 <br /> operating pad to level site <br /> 808 - - . --• - •- - . .- • - . • Ripper 4 2.71 $446.00 <br /> 090 = . - . - _. - - _.:, : . . • Dozer 4 0€ $40:00 <br /> 040 - •- _ DozeF 4 s32 $454,00 <br /> 010alt Regrade access road, build waterbars, improve Dozer 1 4 $1,656.48 <br /> drainage ditch and on-site water retention. <br /> 044 Rcvcgetat„, 8^ plan Revege 4 8:00 $27354,-00 <br /> 012 Mobilize reclamation to site (sans Loader) Mobilize 1 7.00 $3475.00 <br /> SUBTOTALS(equipment/supplies/labor): 29.41 $11,082.48 <br /> SUBTOTALS(indirect costs/supervisor/insurance) -- $5,603.87 <br /> TOTAL -- $16,686.35 <br /> 6.3.5 EXHIBIT E — Map <br /> (1) In addition to the requirements of 6.2.1(2), the Operator/Applicant must <br /> provide a map that clearly describes the features associated with the mining <br /> plan and the components of the Reclamation Plan. Include one map for the <br /> mine plan and one map for the Reclamation Plan. The map(s) must be <br /> drawn to a scale no smaller than appropriate to clearly show all elements <br /> that are required to be delineated by the Act and these Rules; show a <br /> north arrow, note any section corners adjacent to the proposed operation, <br /> and indicate the date illustrated. At a minimum, maps must include the <br /> following information: <br /> (2) Mining Plan Map <br /> (a) outline and label the permit boundaries, described in Exhibit A - <br /> Legal Description; for all 110 and Non In Situ Leach Mining 110d <br /> Limited Impact Operations, the Office considers the area bounded <br /> 11 <br />