Laserfiche WebLink
004 Ripper 4 :2-5 $42:00 <br /> gg2 e' - - _• . . -- _ . . header 4 4:03 $100.00 <br /> 003 Pull down unstable spoil material onto Excavate 1 14.88 $957.00 <br /> operating pad <br /> 004 Pull in berm at edge of operating pad,for Excavate 1 2.77 $178.00 <br /> backfill <br /> 004alt Install permanent steel/cable fence around Construction - $1600.00 <br /> east perimeter of pad (160 ft. x 10.00 lin. foot) <br /> 005 '- -- - '. •• -• - - - Dozer 4 3.35 $650:00 <br /> into portals <br /> 005alt Permanently seal two westerly portals with -- -- $2,100.00 <br /> concrete block 300 square feet)x$7.00 sq/ft <br /> 006 • - . • - - -- - - - • . - - - ' , . Demolish 4 410 $3,961.57 <br /> 006alt Remove or dispose of onsite debris, etc. Demolish 1 .00 $1,000.00 <br /> 007 Push loadout fill material to portals, across Dozer 1 .70 $116.00 <br /> operating pad to level site <br /> 008 ' . :- . . :-: - : - _- • - : Ripper 4 2.71 $446:80 <br /> soil <br /> Ogg =_' . . - _. . - __: : . Dozer 4 Q6 $18:00 <br /> 040 - • - . _ _ Dozer 4 792 $4--51,08 <br /> 010alt Regrade access road, build waterbars, improve Dozer 1 4 $1,656.48 <br /> drainage ditch and on-site water retention. <br /> 014 Rcvcgctatc , 8 s „c.plan Revege 4 880 .5273-54:0G <br /> 012 Mobilize reclamation to site (sans Loader) Mobilize 1 7.00 $3475.00 <br /> SUBTOTALS(equipment/supplies/labor): 29.41 $11,082.48 <br /> SUBTOTALS(indirect costs/supervisor/insurance) -- $5,603.87 <br /> TOTAL -- $16,686.35 <br /> 6.3.5 EXHIBIT E — Map <br /> (1) In addition to the requirements of 6.2.1(2), the Operator/Applicant must <br /> provide a map that clearly describes the features associated with the mining <br /> plan and the components of the Reclamation Plan. Include one map for the <br /> mine plan and one map for the Reclamation Plan. The map(s) must be <br /> drawn to a scale no smaller than appropriate to clearly show all elements <br /> that are required to be delineated by the Act and these Rules; show a <br /> north arrow, note any section corners adjacent to the proposed operation, <br /> and indicate the date illustrated. At a minimum, maps must include the <br /> following information: <br /> (2) Mining Plan Map <br /> (a) outline and label the permit boundaries, described in Exhibit A - <br /> Legal Description; for all 110 and Non In Situ Leach Mining 110d <br /> Limited Impact Operations, the Office considers the area bounded <br /> 11 <br />