My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-28_REVISION - M2001022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001022
>
2016-04-28_REVISION - M2001022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:27 PM
Creation date
5/3/2016 9:57:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
Revision
Doc Date
4/28/2016
Doc Name
Partial Release AR01
From
Loveland Ready-Mix
To
DRMS
Type & Sequence
AR1
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'o 09 <br /> Z <br /> 0 <br /> DISCHAR <br /> SINCPIPELINLAIR I BIG THOM PSON GE RIVERTO z U) -wj b <br /> (PRIMARY) <br /> U) j <br /> WATER SUPPLY 40'FUTURE ROW. DUKE ENERGY w SETBACK FROM <br /> GAS AND OIL FOR MINING PIPELINE FUTURE R.O.W. "LOEWAT <br /> APPURTENANCE SETBACKFROMCENTERUNE =�_ - _\ 1 0 UJ Z <br /> E <br /> ERING DITCH <br /> I WFLI)QQ 0. <br /> z <br /> AND 0 ------ <br /> /WO <br /> I IV *� Lu =Z) <br /> CELL I MINING APPURTENANCE <br /> APPROX.2.8 RECHARG DIRECTION UJ <br /> ACRES POND <br /> Q a w <br /> CELL 2 MIMING BOUNDARY ui <br /> 95.02 ACgS±W PERMIT <br /> PARKING <br /> APPROX.20.8 ACRES 2' <br /> li <br /> LEM DE PIT FLOC LIMITS <br /> CELL 3 <br /> STOCKPILf W FINES 20' MAX DEPTH TO'S oftime w%cx t U) <br /> WASH 740,DO0 TO? APPROX.7.5 ACRES <br /> WATER RST ACRES-) (ONGOING RECLAMATION) <br /> MAX DEPTH TO PIT FLOOR <br /> L <br /> 23- 310.000 TONS -SETBACK <br /> C4 'dam O <br /> ROO A <br /> SITEA CCESS ROADIGAS LINE (ONGOING RECLAMATION) D' To BIG —R <br /> TC I PIPE. DISCHARGE TO <br /> 'JFUEL PLAN P.R.7— TO WELL EASEMENT BIG THOMP—RIVER <br /> CELL 4 SECONDARY) <br /> OFFICE DIKE MINING 1)/ APPROX. 34.2 ACRES (SECONDARY) <br /> STORAGE I :,'' - , 11 <br /> UMITS 22' MAX DEPTH TO PIT FLOOR <br /> TEMPORARY *« .. / - 1 I /., 1,300'000 IONS <br /> BERM I i / __ __ i i MINING <br /> T 1 _._ j <br /> W EXCAVATIM LEGEND <br /> __AqASIOIL .... . . . . . . FOR TOPOGRAPHIC TREATMENT t <br /> SETBACK IN EXCAVATED AREA SEE PROPERTY LINE > <br /> SO H-9 <br /> . . . . . . . TYPICAL CROSS-SECTION <br /> UNPAVED ROAD PERMIT BOUNDARY <br /> . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . <br /> EXISTINK t <br /> . . . . . . . . . . . . . . <br /> TRUCTUREE <br /> EGATE MINING LIMITS <br /> 'WASTE CONCRETE 11.11.1191160 <br /> 'Y4'ROCK AG13R Mtn <br /> 61G�KPILE PILES <br /> w INDEX CONTOUR <br /> 1 AREA PRIOR TO -cm <br /> SACKFILL POTENTLAL-CONCURRENT WETLAN <br /> INTERMEDIATE CONTOUR <br /> APPROX. <br /> AREA, <br /> 1 li?ROCK PROX. 13.9 ACRE <br /> I.. ... � , .S� ITCH <br /> VEGETATION STOCKPILE <br /> . . . . . . . . . :NER/DI <br /> ---------- IGHT-OF-WAY <br /> I ik Z . . . . . . SETBACK AREA <br /> EXISTING E XISTING <br /> VEGETATION RESERVOIR i PAVED ROAD E <br /> 44; <br /> EXISTING OIL AND GAS LEASE <br /> ... . .•.•. . . . . . (NETT-MCGEE) <br /> UNPAVED ROAD <br /> EXISTING VEGETATION <br /> L 2V SETBACK FROM FUTURE R.O.W. GAS LINE <br /> FLOODPLAIN <br /> 401 FUTURE ROW.SETBACK <br /> FROM CENTERLINE <br /> WETLAND MITIGATION APPROVED FLOODWAY <br /> THE ARMY CORPS OF ENGINEERS Lu <br /> SO'FUTURE JOHNSTOWN ROW BY w2mm,PERMIT NO.2001802 <br /> SETBACK FROM CENTERLINE TAJLWATER DrTCH FENCE w 0 <br /> (USED FOR DEWATERING) <br /> EXISTING STRUCTURES <br /> UQUID PETROLEUM 3:6 H <br /> PIPELINE(SINCLAIR) z <br /> POND/RESERVOIR <br /> PIPELINE z <br /> EASEMENT 0 <br /> MINING DIRECTION 9 <br /> SINCLAIR <br /> PIPELINE <br /> DUKE ENERGY GRAPHIC SCALE <br /> EXISTING PIPELINE <br /> STRUCTURES <br /> ------------------- 0 200 400 <br /> APPROXIMATE O.M.G.112 (IN FEET) <br /> PERMIT BOUNDARYI linch= 40011. <br /> THIS MAP K45 BEEN PREPARED UNDER THE <br /> DIRECTION OF AND REVIEWED FOR ACCURACY BY <br /> 2. <br /> A <br /> 01JALIFIED PROFESSKKkL,IN ACCORDANCE WITH <br /> COLORADO DIVISION OF MINERALS AND GEOLOGY ZZ <br /> PIPELINE 36 CONSTRUCTION MATERIALS RULES AND REGULATIONS <br /> o <br /> BY: <br /> Z APPROXIMATE DEPTH 4 <br /> TITLE: <br /> DATE: <br /> V-21' <br /> SACKFILL CONCURRENT <br /> 0 TO MINING <br /> SHALE BEDROCK. ia <br /> TYPICAL CROSS-SECTION OF EXCAVATION SIDE SLOPE co M <br /> (AT PIPELINE) x o <br /> (NIS) W <br />
The URL can be used to link to this page
Your browser does not support the video tag.