My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-02_REPORT - M2000082
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2000082
>
2016-05-02_REPORT - M2000082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2020 11:24:45 PM
Creation date
5/3/2016 9:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000082
IBM Index Class Name
Report
Doc Date
5/2/2016
Doc Name
Annual Fee, Report & Map
From
E 8th Street Operation
To
DRMS
Annual Report Year
2016
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5. <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> 0 a roved mix: Q replaced: A approved mulch: 0 <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement �� rate(tons/ac): <br /> aped fertilizer: C> depth(in.): 0 <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: V AI <br /> 13. Is weed control being conducted in accordance with an ap�ovedWeed Control Plan? YE NO N/A <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(l)? YES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan d Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/A <br /> 1?. Are all hazardous materials stored within approved spill containment structures? I'ES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. Is your basis for legal right to enter still valid? YES NO <br /> 20. Does your permit require you to submit monitoring information annually? YIDS NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R_S.34-32-1 l 6 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: `�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.