Laserfiche WebLink
Table 2 <br /> OPERATIONAL LOSSES <br /> Stonewall Springs Quarry-Evans#2 Pit <br /> 2016 Plan Year <br /> (1) (2) (3) (4) <br /> Plan Year Amount of Water Lost Water Used Total <br /> 2016 Aggregate With Mined for Dust Operational <br /> Production Aggregate Control Losses <br /> Month (tons) (acre-feet) (acre-feet) (acre-feet) <br /> April,2016 0 0.00 0.00 0.00 <br /> May 0 0.00 0.00 0.00 <br /> June 0 0.00 0.00 0.00 <br /> July 0 0.00 0.00 0.00 <br /> August 0 0.00 0.00 0.00 <br /> September 0 0.00 0.00 0.00 <br /> October 0 0.00 0.00 0.00 <br /> November 0 0.00 0.00 0.00 <br /> December 0 0.00 0.00 0.00 <br /> January,2017 0 0.00 0.00 0.00 <br /> February 0 0.00 0.00 0.00 <br /> March 1 0 0.00 0.00 0.00 <br /> Total 1 0 0.00 0.00 0.00 <br /> Notes: <br /> (1)No mining or dust control use <br /> Deere&Ault Consultants, Inc. 12/22/2015 2016 Evans#2 SWSP Tables.xls <br />