Laserfiche WebLink
2.03.8 - PERMIT TERM INFORMATION <br />The anticipated start of each phase of mining activities is discussed in Section 2.05.2 <br />and 2.05.3 Operations Plan. <br />The term of the permit shall be for five (5) years from issuance, renewable under the <br />terms of Rule 2.08.5. <br />The current extent of areas affected by this permit, the anticipated number of acres <br />to be affected during the 5 year term of this permit, and the anticipated number of <br />acres to be affected during the total life of the permit is listed in the following table: <br />In January, 2009, the King I mine was permanently sealed. The final mine map <br />revealed areas where the potential affected areas lie outside of the permit boundary <br />(due to angle -of -draw) as shown at the time. To reflect that change, the permit <br />boundary has been revised with the submittal of TR -24 to show an increased permit <br />area of 87.3 acres. No actual disturbance has ever been noted outside of the <br />previous extents of the permit boundary. The following table provides percentages of <br />surface and mineral ownership with respect to the expanded 87.3 acre permit area. <br />Surface Ownership <br />Current <br />5 Year <br />Life of Operation <br />Location <br />Extent <br />Additional <br />Additional (from <br />from current <br />current <br />King I Surface <br />15.42 Acres <br />+ 1.30 Acres <br />+7.60 Acres <br />Facilities <br />Refuse Pile <br />Refuse Pile <br />King II Surface <br />25.50 Acres <br />+ 0 Acres <br />+ 0 Acres <br />Facilities <br />King I Underground <br />Approximately <br />+ 0 Acres <br />+ 0 Acres <br />Mining <br />990 acres <br />King II Underground <br />Approximately <br />+ 436 Acres <br />+ 436 Acres <br />Mining <br />565 acres <br />+370.46 Acres <br />+ 370.46 Acres <br />Total Permit Area <br />2,702.77 acres <br />(Lease Mod. <br />(Lease Mod. <br />COC -62920) <br />COC -62920 <br />King I Affected Area <br />1,393.45 acres <br />+ 0 Acres <br />+ 0 Acres <br />King II Affected Area <br />487.45 acres <br />+ 436 Acres <br />+ 436 Acres <br />In January, 2009, the King I mine was permanently sealed. The final mine map <br />revealed areas where the potential affected areas lie outside of the permit boundary <br />(due to angle -of -draw) as shown at the time. To reflect that change, the permit <br />boundary has been revised with the submittal of TR -24 to show an increased permit <br />area of 87.3 acres. No actual disturbance has ever been noted outside of the <br />previous extents of the permit boundary. The following table provides percentages of <br />surface and mineral ownership with respect to the expanded 87.3 acre permit area. <br />Surface Ownership <br />Mineral Ownership <br />Federal 0% <br />63.65% 55.57 Acres <br />State 0% <br />0% <br />Private 100% <br />36.35% 31.73 Acres <br />GCC Energy, LLC <br />Section 2.03.8 <br />Page 1 <br />King I Mine <br />November 30, 2015 (TR -24 AR#2) <br />