Laserfiche WebLink
-- - ----- . -...- <br />REVEGETATION <br />• Seeding and Shrub Planting <br />Table 12.2, PSCM Upland Area Seed Mix, and Table 12.3, PSCM Mesic Site Conditions <br />Seed Mix, reflect the species and seeding rates for the approved revegetation seed mixes. <br />Although no seeding was required in 2014 or 2015, supplemental broadcast seeding was <br />completed in 2014 for recently disturbed ditches, slopes near the portal, and selected areas <br />within the 356.4 acre disturbance boundary to stabilize these areas and increase vegetative <br />cover. <br />No shrubs or trees were planted in 2015. <br />• Weed Control <br />Noxious weed surveys were completed to identify areas of weed infestations on the PSCM <br />reclaimed areas in 2015. Targeted weed control spraying was conducted using selective <br />herbicide mixtures to control several identified species, with thistle and hounds -tongue as <br />the primary targeted species, and secondary spraying of any areas of whitetop, mullen, and <br />toadflax. Weed control areas will be monitored in 2016 for effectiveness and any necessary <br />follow-up treatment. <br />See Attachment B — Weed Control Logs, for details on the 2015 herbicide spray <br />applications (actual log is on file at the mine site). Since sprayed areas were relatively <br />small and adequately described in the weed control log, a map will not be provided with the <br />2015 report. Note that the building perimeters (office, shop, etc.), substations, and road <br />perimeters were monitored and sprayed as needed. <br />• Revegetation Success Monitoring <br />The CDRMS approved Minor Revision (MR -27) for minor changes to the vegetation <br />success criteria of the solid waste disposal or landfill area. The landfill is an area <br />comprised of approximately 8.0 acres and was approved for Phase I Bond Release as a part <br />of SL -4 (Seneca II) in June of 2010. PSCM proposed the vegetation success criteria be <br />changed to that of the more recently disturbed areas associated with the underground mine <br />as described in Section 2.05.4 (Reclamation Plan) of the approved mine permit. As a result <br />of the approved revision, only the sagebrush reference area will be used for revegetation <br />success evaluations for the reasons described in Section 2.05.4(2)(e)(vi) of the PSCM <br />permit as the pre -mine area of the landfill was predominantly sagebrush. <br />Quantitative sampling was undertaken in August 2014 by ESCO/Cedar Creek Associates to <br />evaluate revegetation success for the landfill area. The revegetation in this area met all <br />applicable success criteria and an application for Phase II Bond Release will be prepared <br />and submitted in the near future. <br />2015 ARR 3 <br />