My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-02_REPORT - C2009087 (5)
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2016-05-02_REPORT - C2009087 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:34 AM
Creation date
5/2/2016 12:51:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Report
Doc Date
5/2/2016
From
Peabody Sage Creek Mining, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�",�. �Y�vF� _ � R���� y♦ aa;; < �' M1#.: ;aC'',�?yntr �,- ,i'"r'k�'i+fF�3 �., t r� �.i .��4f {, �T '�s,��� <br />� � j <br />�^ <br />� <br />Y�"'F'� r� �Ay, "Ve �. i • F�I <br />} 1 �� <br />��,. � � 4i`' �" ' � Y �r? r�'� <br />��, <br />� ♦ ,�;:: r b �� <br />�'uk�.�£ <br />'.�,kt�'tS: �tif`.�� nils 3 Y- .�`,'�Ni .Y�;{c�' . ,�� , ... 3�'Y�+ '#C. .. ,�� �4Y� 't•+� M€ <br />PHASE I • ♦ • ♦SE III FULL / 1 <br />REMAINING REMAINING REMAINING RELEASE <br />SL - <br />01/03/04 <br />Sil <br />\ \ <br />\ • <br />\ <br />2015 DISTURBANCE AREA <br />In 2015, no additional acres were permitted to be disturbed, and no new disturbance occurred. The <br />annual disturbance status is reflected on the CDRMS Annual Report Form and is further described in <br />the text of this report. Refer to the 2015 Annual Report maps for the extent and status of the existing <br />mine disturbance. <br />BACKFILLING AND GRADING <br />In 2015, no new areas were backfilled or graded. <br />SOIL MATERIAL MONITORING <br />PSCM is required by Permit C-09-087 to monitor soil handling operations for Seneca II Mine, <br />including soil salvage, storage, and redistribution. <br />• Soil Recovery Documentation <br />No soil material was salvaged during 2015 <br />• Soil Pits - Soil/Spoil Fertility and Quality <br />No new soil material placement occurred in 2015; therefore, no soil pits were established <br />and no soil/spoil quality samples were collected or analyzed. <br />• Soil Balance <br />No soil salvage occurred in 2015. Therefore, as for the two previous years (2013 and <br />2014), the current soil material balance reflects an average soil replacement depth of 2 feet <br />(24 inches). <br />• Soil Salvage, Storage and Replacement <br />No soil material was replaced in 2015. Stockpile A contains 91.2 acre-feet (147,150 cy) of <br />soil material. <br />2015 ARR 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.