Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />April 27, 2016 <br />Page 2 <br />2. Item Resolved. <br />3. Based on the March 21, 2016 submittal, the IP Tailwater Ditch I and the IP Tailwater <br />Ditch 2 are included with the Pond 009 design. According to Map 2.05.3(3)-1, these two <br />ditches flow to the proposed Pond 016. According to the submitted Table 2.05.3(3)-1 and <br />Attachment 2.05.3(3)-30 the design for Pond 009 includes the designs for the Tailwater <br />ditches. Additionally, Attachment 2.05.3(3)-29 includes the tailwater ditch as apart of <br />the Pond 016 design. If it is the case that the Tailwater ditches are a function of the Pond <br />009 watershed and not the Pond 016 watershed, please update the Map 2.05.3(3)-1 and <br />Attachment 2.05.3(3)-29 to identify the tailwater ditches draining to the Pond 009 <br />watershed. <br />Response: Map 2.05.3(3)-1 has been updated to clarify that the structures labeled IP <br />Tailwater Ditch 1 and IP Tailwater Ditch 2 flow to Pond 009. Attachment 2.05.3(3)-30, <br />the design for Pond 009, includes the designs for IP Tailwater Ditch 1 and IP Tailwater <br />Ditch 2. Map 2.05.3(3)-1 has also been updated to clarify that the structure labeled <br />Tailwater Ditch flow to the proposed Pond 016. Attachment 2.05.3(3)-29, the design for <br />Pond 016, includes the Tailwater Ditch design. Attachment 2.05.3(3)-1 and Table <br />2.05.3(3)-1 have also been updated to reflect this information. <br />4. Item Resolved. <br />5. Item Resolved. <br />Section 2.05.4(2)(c) — Backfill and Grading <br />1. Item Resolved. <br />2. Item Resolved. <br />3. Item Resolved. <br />Section 2.05.4(2)(d) — Topsoil Handling, Stockpiling and Redistribution <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy Cooperative; <br />