My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-08_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2016-04-08_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:38 PM
Creation date
4/28/2016 1:44:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/8/2016
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hubbard Creek and Terror Creek will be monitored quarterly at the designated <br />upstream (D34-14) and downstream (HUB -LOW) monitoring locations shown on <br />Map 9. Field parameters will be measured each quarter. A full suite sample from <br />List 1 will be obtained semi-annually during the second and fourth quarters. <br />Hubbard Creek and Terror Creek flow was measured at the upstream and <br />downstream monitoring locations by the USGS. The stream gaging stations were <br />installed by the USGS during 2001 under a cooperative (cost sharing) agreement <br />between the Operator, Delta County and the USGS. Resource Engineering will <br />measure quarterly flows in the creeks beginning the second quarter 2015. <br />The Fire Mountain Canal will be monitored 3 times per year during May, July and <br />September at the designated upstream and downstream monitoring locations shown <br />on Map 9. Field parameters will be measured during each monitoring event. A full <br />suite sample from List 1 will be obtained semi-annually during the first and third <br />monitoring event. <br />Freeman, Sheep Corral, Stevens and Dove Gulches will be monitored quarterly at <br />the designated upstream and downstream monitoring locations shown on Map 9. <br />Field parameters will be measured each quarter. A full suite sample from List 1 will <br />be obtained semi-annually during the second and fourth quarters. <br />Iron Point Gulch monitoring will be suspended with PR -14. Iron Point Gulch was <br />initially monitored because it was projected to be undermined. Mining in the area of <br />Iron Point Gulch has been suspended and the Gulch is located about one half mile <br />from the projected angle of draw. <br />The North Fork of the Gunnison River will be monitored quarterly at the designated <br />upstream and downstream monitoring locations shown on Map 9. Field parameters <br />will be measured each quarter except flow will not be estimated. Base flow for the <br />river will be obtained from the USGS Somerset water stage recorder. The gaging <br />station is located in the SE/4SW/4 of Section 10, Township 13 South, Range 90 <br />West in Gunnison County approximately 2.3 miles east of Somerset and 4.8 miles <br />upstream from Hubbard Creek. The recorder is located on the south bank of the <br />river across from the reclaimed Hawksnest Silos. The gage is a water -stage <br />recorder with satellite telemetry. A full suite sample from List 1 will be obtained <br />semi-annually during the second and fourth quarters. During August of each year a <br />sample will be obtained and analyzed for the parameters on List 2. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />TR -103 2.05-125 05/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.