Laserfiche WebLink
Flatiron Constructors, Inc. <br /> 385 Interlocken Crescent Blvd <br /> Suite 900 <br /> Broomfield. CO 80021 <br /> 720-494-8000 MAIN <br /> 303-776-0072 FAX <br /> April 22, 2016 www.flatironcorp.com <br /> Division of Reclamation, Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> SUBJECT: Permit No. M-2006-078 <br /> 111 Annual Fee Invoice and Annual Report <br /> Flatiron Constructors, Inc hereby submits its 2015 Annual Report for the Camenish <br /> Borrow, Pit Number M-2006-078. Check Number 824907 in the amount of$1,512 is <br /> included herein for the 2014 annual fee, the 2015 annual fee and a civil penalty. <br /> Stripping of overburden material and export of material from the Camenish Borrow Pit <br /> began at the beginning of May 2007 for the Colorado Department of Transportation, 1-25 <br /> Widening Project No. IM-0253-160. Currently, all mining work has been completed. <br /> Reclamation work at the pit is complete with perimeter sealing from the surrounding <br /> alluvium with compacted core with approval of compacted clay liner from the State <br /> Engineer's Office. <br /> Best Regards, <br /> Kevin Pow II <br /> Operations Engineer <br /> Central Division <br /> Flatiron Construction <br />