My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-25_REPORT - M2006078
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006078
>
2016-04-25_REPORT - M2006078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:10 PM
Creation date
4/27/2016 8:46:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
REPORT
Doc Date
4/25/2016
Doc Name
Annual Fee, Report and Map
From
Flatiron Constructors, Inc.
To
DRMS
Annual Report Year
2015
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flatiron Constructors, Inc. <br /> 385 Interlocken Crescent Blvd <br /> Suite 900 <br /> Broomfield. CO 80021 <br /> 720-494-8000 MAIN <br /> 303-776-0072 FAX <br /> April 22, 2016 www.flatironcorp.com <br /> Division of Reclamation, Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> SUBJECT: Permit No. M-2006-078 <br /> 111 Annual Fee Invoice and Annual Report <br /> Flatiron Constructors, Inc hereby submits its 2015 Annual Report for the Camenish <br /> Borrow, Pit Number M-2006-078. Check Number 824907 in the amount of$1,512 is <br /> included herein for the 2014 annual fee, the 2015 annual fee and a civil penalty. <br /> Stripping of overburden material and export of material from the Camenish Borrow Pit <br /> began at the beginning of May 2007 for the Colorado Department of Transportation, 1-25 <br /> Widening Project No. IM-0253-160. Currently, all mining work has been completed. <br /> Reclamation work at the pit is complete with perimeter sealing from the surrounding <br /> alluvium with compacted core with approval of compacted clay liner from the State <br /> Engineer's Office. <br /> Best Regards, <br /> Kevin Pow II <br /> Operations Engineer <br /> Central Division <br /> Flatiron Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.