My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-26_REVISION - C1981035 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-04-26_REVISION - C1981035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:13 PM
Creation date
4/27/2016 6:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/26/2016
Doc Name
Adequacy Review #4
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR20
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natwa! Reso ace, <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />26 April 2016 <br />To: Tom Bird, Manager of Coal Services <br />GCC Energy, LLC <br />4424 County Road 120 <br />Hesperus, Colorado 81326 <br />From: Robin Reilley, GISP, DRMS <br />RE: King Coal Mine; Permit: C-1981-044 <br />Technical Revision 20 Adequacy Review #4 <br />Dear Mr. Bird: <br />This submittal is in response to your letter of 28 December, 2015, "King Coal Mine <br />(C-1981-035) TR -20 - Adequacy Review #3" Response". <br />The original purpose of this technical revision was to allow the use of coal mine <br />waste from the King II mine to be placed along the west pre-SMRCA high -wall cut <br />at the King II mine. This material would be placed in such a way as to <br />approximate pre disturbance profiles of the west high -wall and help to lessen the <br />visual impact of the site. As mentioned, the site is pre -law, and GCC Energy is <br />under no obligation to construct this structure. <br />On June 9, 2015, GCC Energy received a letter from your office requesting <br />additional sampling and analysis of the existing refuse pile at the King I mine as <br />well as additional roof, coal and floor sampling and analysis of areas within and <br />adjacent to the King II mine. These concerns were originally addressed in our TR - <br />20 "Adequacy Review 2A (Supplemental) Response", submitted June 30, 2015. <br />That response has been reviewed by the Division and additional comments were <br />received from the Division by GCC Energy as TR -20, Adequacy Review #3. Those <br />comments are addressed in this 28 December submittal. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />OY CotG <br />* IR76 �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.