Laserfiche WebLink
PERMIT #: M-1980-244 <br />INSPECTOR’S INITIALS: TC1 <br />INSPECTION DATE: March 15, 2016 <br /> <br /> <br />Page 3 of 10 <br />observe stormwater controls and ECOSA slope stability. No movement of the overburden storage pile was <br />observed. Stormwater intercept channels for the ECOSA (see Photos 7 and 8) appeared to be sufficiently <br />separated from the stormwater system for the adjacent access road (see Photo 9). <br /> <br />Water levels: The inspection continued as the Division visited each of the high and low solution collection <br />system transducers and recorded water level values. The recording sheet is included as Attachment A, and the <br />values are summarized below in the Transducer Readings. Mine Low Volume Solution Collection System (LVCS) <br />inspection log books were observed in the Phase IV and V pump shelter buildings. <br />The North and South Arequa Gulch underdrains were inspected. The South Underdrain dis charge was <br />determined to be 17.1 gpm. The North Underdrain was dry. The A35 pumpback line was dry. The B63 <br />pumpback was flowing at 0.63 gpm.