Laserfiche WebLink
-4- <br /> 12. Primar future(Post-mining)land use(check one): <br /> LJ Cropland(CR) fl Pastureland(PL) General Agriculture(GA) <br /> l l Rangeland(RL) J Forestry(FR) Wildlife Habitat(WL) <br /> flRcsidcntial(RS) J Recreation(RC) Industrial/Commercial(IC) <br /> ElDeveloped Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one <br /> 111 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> fl Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) jJ Recreation(RC) 0 Industrial/Commercial(IC) <br /> t_1 <br /> Developed Water Resources(WR) <br /> Pe ( ) <br /> 14 Method of Mining. Briefly explain mining method(e.g.truck/shovel): <br /> Trackhoe and front end loaders remove material for delivery to the processing plant. <br /> 15 On Site Processing. I I Crushing/Screening <br /> 13.1 Briefly explain mining method(c.g.truck/shovel): <br /> Material is processed into specification aggregates using crushers, and screen plants <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment increases the mine area and reserves under permit by 641.64 acres. The <br /> mining method does not change but he plant site may be moved south as the existing permit <br /> area is mined out. The final reclamation plan and reclamation methods do not change. The <br /> primary access remains as currently approved. It also combines 2 permitted mines into one and <br /> retains the southern access point. Southern access - 40d05'40.41"N, 104d49'48.17"W <br />