Laserfiche WebLink
April 19, 2016 C-1981-010/Trapper Mine JDM <br /> SUPPORT FACILITIES-Rule 4.04: <br /> Technical Revision No. 115 includes proposed Blasters Building construction within an area which has been <br /> approved to be disturbed. The construction for the building has not begun;however the pad area has been <br /> constructed and crews were on-site at the time of the inspection. The Division recommends the submittal of a <br /> Minor Revision application for the construction of the building. <br /> Blasters Supply Building Pad <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> Topsoil stripping limits were inspected at the south eastern portion of the site. All topsoil stripping has occurred in <br /> the permitted limits with no deviations at the time of this inspection. Technical Revision No. 115 is currently <br /> under review by the Division which would permit additional topsoil stripping areas. <br /> Topsoil Stripping Area not yet approved <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 5 <br />