Laserfiche WebLink
Air Pollution Control Plan <br />The New Horizon Mine will generate air pollutants from excavation and reclamation operations <br />throughout its mine life. Control and minimization of these pollutants will be achieved by <br />temporary spoil compaction, watering of disturbed areas as needed, topsoiling and revegetation <br />of areas, and other methods. The final approval for Modification #3 of Construction Permit No. <br />88MO234F which was issued January 20, 2006 by the Colorado Department of Public Health <br />and Environment (CDPHE), Air Pollution Control Division is attached to this section. <br />January 2016 (MR -96) 2.05.6(1)-1 <br />