My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-19_PERMIT FILE - P2013010
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2013010
>
2016-04-19_PERMIT FILE - P2013010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:17 AM
Creation date
4/22/2016 9:16:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013010
IBM Index Class Name
PERMIT FILE
Doc Date
4/19/2016
Doc Name
NOI Form 2 MD01
From
Ouray 79 Mining, LLC
To
DRMS
Type & Sequence
MD1
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (FORM 2 - Public.filing) <br /> 12. List the seed mixture to be used in the re-establishment of egetation. See the attached seed mixture calculation to obtain <br /> PLS acre. For assistance with formulating seed mixtures and rates. contact the local NRCS if on prig ate land. BLM CSFS if <br /> on public land or State Land Board if on state land. <br /> A. Pro\ide plant name and seeding rate <br /> Plant Name Seeding Rate(PLS/acre) <br /> Slender Wheatgrass 7.00 <br /> Mountain Brome 7.00 <br /> Blue Bunch Wheatgrass 2.00 <br /> Canadian Wild Rye 2.00 <br /> Lewis Flax 2.00 <br /> B. Describe the method for seed bed preparation.and application method for grass forb seeding. <br /> The seed bed will be scarified and scattered with on-site debris (downed <br /> timber/boulders), then seed will be hand-broadcast onto the area that is scarified, and <br /> raked in by hand. The scarification and scattering pattern will be done on a manner to <br /> attempt to prevent wind erosion prior to revegetation taking hold. The reseeding will <br /> be done in the fall season to allow for winter snowfall and associated melt to <br /> saturate the seed bed in order to achieve the best vegetation results. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 3. Reclamation measures shall be fulfilled in a timer manner and completed within tip e (5) years of completion of prospecting <br /> activities. <br /> 4. The prospecting operations described in this Notice w ill be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5.precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails,w here practicable. Existing roads which are to remain as <br /> permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br /> prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> stream channel. Drill cuttings must be spread to a depth no greater than one-half(1:2) inch or buried in an approved <br /> disposal pit; <br />
The URL can be used to link to this page
Your browser does not support the video tag.