Laserfiche WebLink
3 (FORM 2 - Public filing) <br /> I. LOCATION MAP: Attach a USES 7.5 minute quad. or similar map of adequate scale, which locates the prospecting <br /> site(sl. <br /> J. Are prospect sites(e.g.. drill holes. trench locations.etc...) staked on the ground? Yes No <br /> K. Specify the Land Management Agenc.\, Address and Telephone Number: <br /> N/A <br /> L. The prospector is required to document that the NOI has been sent to the BLM or the USES. Processing of the NOI v ill <br /> not begin until the prospector has submitted e\idence acceptable to the Di\ision that the NOI \as sent to the BLM or <br /> USFS. Check one: <br /> E\idence of notification is attached to this NOL for BLM Land <br /> E\idence of notification is attached to this NOI for[SFS Land. <br /> Other proof of notice is attached to this NOI <br /> II. MAPS & DRAWINGS <br /> Accurate topographic base map show ing the location of the proposed project must be submitted w ith this notice. The prospector <br /> may submit a U.S.G.S. 7.5 minute quadrangle.or similar map of adequate scale that: <br /> 3. identifies the proposed prospecting site(s)or actin its areas invol\ing surface disturbance. Acti ity areas include all drill holes, <br /> mud pits, exca\ations, trenches,adits,shafts. tunnels, rock dumps. stockpiles. impoundments and prospecting roads, and <br /> 4. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br /> are not anticipated to be affected. This includes the location of all drill holes.mud pits,excaations,trenches,adits. shafts. <br /> tunnels.rock dumps, stockpiles. impoundments and prospecting roads. Color photographs. adequately labeled(including <br /> date,orientation and location),of the prospecting site mai be used to fulfill this requirement if included with the NOI <br /> submittal. <br /> Specific drilling locations are confidential. <br /> Ill PROJECT DESCRIPTION <br /> 7. Mineral(s)and/or Resource(s)being In\estigated: Au and associated metals <br /> 8. Estimated dates of commencement and completion: <br /> Commencement: May 1, 2016 <br /> Completion: July 15, 2017 <br /> 9. Amount of material to be extracted,moved or proposed to be moNed:_approximately 120 cubic feet of drill core <br /> 10. Identify the t.N pe or method of prospecting proposed and quantity(place an"X") <br /> Cuts Pits "Trenches <br /> Shafts Tunnels Adits Declines <br /> ✓ Air Drilling V Fluid Drilling Drilling&Blasting <br />