Laserfiche WebLink
6 (FORM 2-Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> The target area is rugged mountain with minimal topsoil, less than four inches in areas of <br /> interest. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> NA <br /> 10. Describe how portals,adits, shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> Upon completion of exploration, surface material will be distributed and graded with a <br /> dozer lo Mend with surrounding lupugrapghy. Seeding and mulching will occur as directed... <br /> by US BLM and the Division. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> Roads built during exploration that will not be part of the mine plan will be graded to match <br /> surrounding topography. The target area is mountain face and outcrop. Rock debris in <br /> the vicinity will be placed on the graded surface. <br />