My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-20_REPORT - M2011004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2011004
>
2016-04-20_REPORT - M2011004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:58 PM
Creation date
4/22/2016 9:15:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011004
IBM Index Class Name
Report
Doc Date
4/20/2016
Doc Name
Annual Fee, Report and Map
From
KrauthCo Inc.
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turnkey landscaping Fourmile <br /> Company Sandstone Quarry <br /> 1YrauthCo INC. <br /> 1068 Red Canyon Rd.Canon City,CO <br /> 344 E.HWY 50 Salida,CO <br /> 719-275-5727&719-539-8628 <br /> 04/11/16 <br /> Current Disturbances to Affected Land <br /> The phase one bonding area, remains the affected area. Bench mining in the previously disturbed <br /> "upper pit" area still within the bonded area. Bench mining, in the lower pit area remains unchanged. <br /> Total affected area remains within the bonded area. <br /> Required monitoring information <br /> All items within compliance,and or exemption status. <br /> Reclamation accomplished to date and during previous year <br /> The loading area received improvements to drainage and surface,for dust suppression.We received an <br /> inspection from DNR and were found to be in compliance. Erosion control berms on roads and <br /> stormwater diversion methods continue to be addressed and managed. Loose debris( stone,dead tree <br /> limbs etc) is regularly removed and managed to keep the site properly maintained. As no topsoil is <br /> included with our approved reclamation plan,we continue to keep the extraction points cleaned. <br /> Sediment trap points are being routinely installed to slow run-off,from snow and rain, in affected areas, <br /> as storm-water discharge events must be managed to protect public waterways. <br /> Anticipated disturbances for 2016 <br /> Layered mining continues in the upper pit with no additional disturbances, beyond the described <br /> activities are anticipated. <br /> Respectfully Submitted, <br /> Mike Krauth Jr./President-KrauthCo <br />
The URL can be used to link to this page
Your browser does not support the video tag.