Laserfiche WebLink
Answers to Rule 3.1.5(9) <br /> (a) After obtaining (TR-02) for M-1989-092 it became apparent that the berm on the <br /> SE of the pit should be kept at it's original height. In order to accomplish this fill <br /> will need to be imported. The pit wall on the NW is too steep and fill will be <br /> needed to bring the slope to 4/1 (see map) for current locations. <br /> (b) Approximately 15,000 cubic yards. <br /> (c) Affidavit on request for(TR) cover sheep. <br /> (d) From now until reclamation is completed. <br /> (e) The fill will be covered with topsoil to generate a 4/1 slope that matches the post <br /> mining plan. <br /> (f) The imported material will be placed with one of the following: a D6, D9 <br /> bulldozer, 627 scraper, 144 Cat blade, or 645 loader. Settling and voids are never <br /> a problem due to the type and moisture content of the material to be imported. <br />