My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-21_REVISION - M1977004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977004
>
2016-04-21_REVISION - M1977004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:06 PM
Creation date
4/22/2016 8:36:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
Revision
Doc Date
4/21/2016
Doc Name
Request TR07
From
Homestake Mining Company of California
To
DRMS
Type & Sequence
TR7
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aw <br /> cc,,,/,,ter RO .._.. <br /> 10\4. <br /> e( t <br /> $./ <br /> *, $ COLORADO DIVISION OF RI <br /> i -- <br /> Vi 313 Sherman Street Room 215 Der <br /> ��..// }1876* b 1 VIOLATION: MV2012-011 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 77-004H R Site Name: Pitch Reclamation Project <br /> County Saguache TR# (DRMS Use only) <br /> Permittee: Homestake Mining Company of California <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Bill Ferdinand - Director of Environment <br /> Please provide a brief description of the proposed revision: <br /> Installation of up to four piezometers at the toe of the Indian Rock Dump, with construction of associated <br /> surface pads• pilot testing of injection-hased strategies (Indian Rock Dump and Underground Workings) <br /> for uranium mass load reduction to surface water(continuation of 2015 field activities). <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 17 <br /> 112 hard rock(not DMO) $175 El <br /> 110d, 112d(1, 2 or 3) $1006 ®✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.