Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Final Reclamation <br /> Site: Ayers Pit Permit Action: Final Reclamation Permit/Job#: M1981004 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 4/15/2016 County: Morgan Filename: M004-001 <br /> User: ECS <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description _ Used Size Hours Cost <br /> 002 Reslope Highwall DOZER 1 402.05 $71,178.00 <br /> 003 Mob/Demob Dozer MOBILIZE 1 3.50 _ $1,022.00 <br /> 004 Reveg REVEGE 1 8.00 $9,821.00 <br /> SUBTOTALS: 413.55 $82,021 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,656.82 <br /> Performance bond: 1.05 Total= $861.22 <br /> Job superintendent: 0.00 Total= $0.00 <br /> Profit: 10.00 Total= $8,202.10 <br /> TOTAL 0&P= $10,720.14 <br /> CONTRACT AMOUNT(direct+0&P)= $92,741.14 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $4,637.06 <br /> CONTINGENCY: 3.00 Total= $2,460.63 <br /> TOTAL INDIRECT COST= $18,317.83 <br /> TOTAL BOND AMOUNT(direct+indirect)= $100,338.83 <br />