My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-20_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-04-20_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:58 PM
Creation date
4/20/2016 12:40:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/20/2016
Doc Name
Adequacy Review No. 2
From
DRMS
To
Tri-State Generation and Transmission Association, Inc
Type & Sequence
TR70
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />April 20, 2016 <br />Chris Gilbreath <br />Tri-State Generation and Transmission Association, Inc. <br />P.O. Box 33695 <br />Denver, CO 80233-0695 <br />Re: New Horizon 2 (Permit No. C-1981-008) <br />Technical Revision 70 (TR -70) <br />Adequacy Review 2 <br />Dear Mr. Gilbreath: <br />The Division received your adequacy question responses for TR -70 on March 28, 2016. The Division reviewed <br />your responses and has the following additional questions: <br />Section 2.04.9 — Soil Resource Information <br />1. Item Resolved. <br />2. Topsoil placement zones 5-8 have been added to Map 2.05.4-9 and Map 2.05.4-7 will be removed from <br />the permit. The topsoil volume information that was added to Map 2.05.4-9 from Map 2.05.4-7 is <br />inconsistent. For example, topsoil pile 4 on Map 2.05.4-7 is labeled as having 13,266 cy and on Map <br />2.05.4-9 it is labeled with 15,123 cy. There is also a difference in volumes for topsoil piles 12A, 12B, <br />12C, 12D, 12E and 12F. Please clarify why the topsoil volumes are different. <br />Section 2.05.3(3) — Mine Facilities <br />This item was corrected as requested in the first adequacy letter for TR -70. Since the first adequacy letter <br />was submitted to Tri-State, the comment period on MR -98 closed and the revised pages were <br />incorporated. The revisions of MR -98 changed the pagination of Section 2.05.3(3). Please re -submit the <br />proposed changes of TR -70 in the new format that was incorporated with MR -98. <br />2. Item Resolved. <br />3. Based on the March 21, 2016 submittal, the IP Tailwater Ditch 1 and the IP Tailwater Ditch 2 are <br />included with the Pond 009 design. According to Map 2.05.3(3)-1, these two ditches flow to the <br />proposed Pond 016. According to the submitted Table 2.05.3(3)-1 and Attachment 2.05.3(3)-30 the <br />design for Pond 009 includes the designs for the Tailwater ditches. Additionally, Attachment 2.05.3(3)- <br />29 includes the tailwater ditch as a part of the Pond 016 design. If it is the case that the Tailwater <br />QF CQ�Q <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director * * 1g76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.