Laserfiche WebLink
REctrl V <br /> FD <br /> o/ APR $ ?016 <br /> �l SI�N OF <br /> Rocky Mountain Materials&Asphalt,Inc <br /> Red Canyon Quarry <br /> Blasting Plan <br /> The onsite Foreman will follow the following plan when blasting is to be initiated at Rocky Mountain <br /> Materials'Red Canyon Quarry site. <br /> 1. Blasting Schedule. <br /> • Notification to Blasting Co any <br /> • Scheduled Blast Date: b I 1(o <br /> Time: '7.'00 <br /> 2. Notification of Outside Agencies.(Minimum 72 hrs.prior to blast event). <br /> • Colorado Division Of Reclamation,Mining&Safety <br /> Tim Cazier 303-866-3567 Ext.8169 <br /> • Ken Bishop(Adjoining Property Owner) <br /> Email:emu• <br /> • Additional Notification <br /> A. <br /> B. <br /> 3. Ground Control.Radio communication will be maintained at all times between the site foreman <br /> and the lead blaster. <br /> • Safety Brlilfingwith Blasting Crew <br /> Date: Time: AI" <br /> Forman: Blaster: tl<" r <br /> • Access to Blast area c osed <br /> Time: a A%3 R1 N�tO BY: S:U0 R 71 <br /> • Mine site cleared and aaccess closed <br /> Ztl <br /> Time:- <br /> .2 .J'BY: C�o N QU Gk-hz/ <br /> • Blast Initiation 1 Time: Q:00 A•M- By: VON /BUG1</ey <br /> • Blast Area Qeared �(/�� <br /> Time: I f�t, �By: uck ley <br /> ey <br /> 4. Blast Report:The blast report will be completed by the Certified blaster in charge of the event <br /> and will include,at minimum,the following information. <br /> A. Mine Site <br /> Date <br /> Time <br /> Location of Blast:To include GPS coordinates of the initiation point <br />