Laserfiche WebLink
yellow line is the existing Little Turkey Creek Road. The green line is Highway 115. The <br /> fuchsia circle highlights the intersection. <br /> C,f11/0 <br /> 41,14 <br /> Is <br /> y� <br /> ea <br /> Figure 20 Intersection of New Quarry Road and Highway 115 <br /> The Transit Mix flyer and application indicates that there will be up to 2.0 million tons of <br /> material removed from the quarry per year during peak operations. This would result in <br />